The image is a flowchart titled “Implementation of Phase 2: Highway 6 / Hanlon Expressway Midblock Interchange (GWP 3059-20-00).” It outlines the key steps and timeline for executing Phase 2 of the highway improvement project.
Flowchart Steps (Top to Bottom):
Advertisement of the Request for Proposal – Occurred in June 2021.
Award of the Project to the Design-Build Contractor – Anticipated in Early 2022.
Continuation of Detailed Design and Class Environmental Assessment – Conducted by the selected Design-Build Contractor.
Finalize Design and Construction Staging/Sequencing – Based on frameworks developed during the Design-Build Ready Phase.
Confirm Environmental Impacts and Mitigation Measures – Includes obtaining or finalizing all necessary permits and approvals.
Issue Design and Construction Report(s) – For public and agency review.
Annual Reporting – On the Ministry of the Environment, Conservation, and Parks Conditions of Approval.
Orientation and Relationships:
The flowchart is linear and vertical, showing a chronological sequence of tasks.
Each step builds upon the previous, emphasizing a structured approach to design, environmental compliance, and public engagement.